Construction of an energy storage facility (ESF) + solar power plant (SPP)

Hybrid power plant SPP + UZE, contributes to the reduction of greenhouse gas emissions by:
• Replacing electricity generated from fossil fuels;
• Reducing the need for peak thermal generation by shifting solar power generation to evening hours;
• Increasing the efficiency of system balancing thanks to UZE;
• Reduction of electricity losses in networks.
Design capacity: 10 MW/20 MWh
Connection/voltage: 35 kV
Location: Lviv region
Land area: 20 hectares
Project implementation period (estimated): 10-12 months
Investment volume (estimated): 11,166,203.60 USD
Investment payback period: 7 years