Construction of a Modular Gasification-Based Steam Thermal Power Plant
The project construction of a modular gasification-based steam thermal power plant with an installed capacity of 15,000 kW of electrical output and 15,000 kW of thermal energy.
Construction of a Modular Gasification-Based Steam Thermal Power Plant
15 MW Electric and 15 MW Thermal Capacity
Project Overview
The project construction of a modular gasification-based steam thermal power plant with an installed capacity of 15,000 kW of electrical output and 15,000 kW of thermal energy.
The technological solution is based on high-temperature solid fuel gasification, followed by the production of generator gas, steam generation, and electricity output.
The primary feedstock is brown coal sourced from an owned quarry.
Technological Structure
The plant comprises the following core components:
• fuel bunker
• lock feeder system
• gasifier
• steam generator
• steam engine
• electric generator
• heat exchangers
The facility operates in cogeneration mode, enabling simultaneous production of electricity and thermal energy.
Key Technical Parameters
Installed capacity:
• 15,000 kW electric output
• 15,000 kW thermal output
Total investment requirement:
USD 4,500,000
Estimated payback period:
1–1.5 years (based on the provided financial model).
Financial Model (Based on Provided Data)
Assumed electricity tariff: 4 UAH per kWh
Revenue calculation:
15,000 kW × 4 UAH = 60,000 UAH per hour
1,440,000 UAH per day
43,200,000 UAH per month
Raw material cost: 15,000,000 UAH per month
Estimated net profit: approximately 20,000,000 UAH per month.
Strategic Value
The project enables:
• utilization of an owned raw material base
• decentralized energy generation
• combined production of electricity and heat
• strengthening of regional energy resilience