top of page

Autonomous Eco-Industrial Park (15 ha)

The project envisions the development of a 15-hectare autonomous eco-industrial park powered by its own 3 MW energy core.

Autonomous eco-industrial park (15 hectares)


Energy infrastructure 3 MW


1. The essence of the project


The project involves the creation of an autonomous eco-industrial park with an area of 15 hectares with its own energy core with a capacity of 3 MW.


The key idea is to create an industrial environment with closed cycles of energy, water, and organic raw materials, which provides:

• complete energy independence,

• environmental safety,

• estimated production cost,

• a stable investment model.


The concept is based on the principles of a closed energy cycle and organic recycling.



2. Energy core — 3 MW


A capacity of 3 MW is the calculated minimum for an area of 15 hectares and provides:

• 100% coverage of the park's energy needs;

• status of "energy donor";

• the possibility of selling excess electricity to the network;

• full payback of basic infrastructure (roads, engineering networks, security systems).


Annual indicators:

• up to 23–25 million kWh of electricity;

• up to 20–22 thousand Gcal of thermal energy.


3. Park infrastructure


The 15-hectare area includes:

• energy complex — 3 hectares;

• production area — 4 hectares;

• biomass growing complex (chlorella) — 1.5–2 hectares;

• residential area for personnel — 1.5 hectares;

• administrative and commercial block — 2 hectares;

• engineering and buffer zones — 2 hectares.


The project is focused on locating production enterprises with deep processing of organics and closed technological cycles.


4. Economic model


Investment volume in the energy complex: €9–11 million

(depending on the configuration - with or without its own wastewater treatment system)


Estimated payback period: 3–4 years.


Sources of income:

• sale of excess electricity;

• sale of heat to residents;

• rental of production space;

• sale of organic fertilizers;

• engineering and maintenance services.


5. Investment attractiveness


The project forms:

• energy-independent industrial cluster;

• a stable cash flow model;

• high demand among industrial residents;

• fast investment return cycle;

• scalability (the ability to increase capacity and expand territory).


The autonomous eco-industrial park is a new generation infrastructure project that combines energy, processing, and sustainable development in a single cost-effective system.

Contacts

Ukraine, Kyiv city, Yevhena Konovaltsya street, building 36-V

  • Whatsapp
  • Телеграмма

+38 099 878 08 22

  • Instagram
  • Facebook
  • LinkedIn

Contact us

© 2026 by S & M. Powered and secured by Wix

bottom of page